Tobin Center for the Performing Arts

Tobin Center for the Performing Arts

Tobin Center for the Performing Arts

CLIENT

Tobin Center

CLIENT

Tobin Center

TIMELINE

Opened 2014

TIMELINE

Opened 2014

BUDGET

$150M

BUDGET

$150M

SQUARE FEET

183,000 SF

SQUARE FEET

183,000 SF

LOCATION

San Antonio, TX

LOCATION

San Antonio, TX

THE MISSION
THE MISSION

The goal was a world-class performing arts center designed to revitalize San Antonio's downtown cultural landscape. The facility includes a 1,700-seat main performance hall and an intimate 295-seat studio theater.

The goal was a world-class performing arts center designed to revitalize San Antonio's downtown cultural landscape. The facility includes a 1,700-seat main performance hall and an intimate 295-seat studio theater.

The Challenge
The Challenge

The project demanded the delicate integration of historic preservation with highly advanced acoustic and technical infrastructure. It also required a strong civic and community engagement component.

The project demanded the delicate integration of historic preservation with highly advanced acoustic and technical infrastructure. It also required a strong civic and community engagement component.

THE STEWARDSHIP
THE STEWARDSHIP

We acted as the Owner's representative from concept through completion.

We acted as the Owner's representative from concept through completion.

The Team
The Team

LMN Architects (design architect), Marmon Mok (executive architect), FDA (theatre planner), Akustics (acoustician), and Linbeck (construction manager).

LMN Architects (design architect), Marmon Mok (executive architect), FDA (theatre planner), Akustics (acoustician), and Linbeck (construction manager).